C.R.E. No. 86,

Kowloon Canton Railway.

BRITISH SECTION ESTIMATE.

Main Head Bridges,

Sub. Head Major No. 4.

Quantity. DESCRIPTION. Unit. Rate. AMOUNT. Drawing No.C.R.F.127 290.00 Excavation in founds. 10/- $290.00 500.00 Timber and pumping. $500.00 2292.50 Concrete in founds. 35/- $2292.50 200.00 Masonry in Footings. 40/- $800.00 90.00 Superstructure. 40/- $3600.00 21.00 Coping and Bed stones. $700.00 4200.00 Dry Stone behind abuts. c.ft. 2/- $84.00 3 20' Spans landed in Kowloon. each 500/- $1600.00 3 Carriage, erection & painting. 100/- $300.00 Total $10151.50 Contingencies 10% $1015.15 Grand Total $11166.65

Page 78

was not directly related to the main content, hence not included. The initial part of the text appears to be OCR errors or unrelated content, so it was not included in the output. The main content starts with "C.R.E. No. 86," and is formatted into a table for better readability. The table includes columns for Quantity, Description, Unit, Rate, and Amount, as per the original content. The "Page 78" information is preserved at the end, as per the instructions.

Edit History

2026-06-04 21:19:49 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C.R.E. No. 86, Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Bridges, Sub. Head Major No. 4. Quantity. DESCRIPTION. Unit. Rate. AMOUNT. Drawing No.C.R.F.127 290.00 Excavation in founds. 10/- $290.00 500.00 Timber and pumping. $500.00 2292.50 Concrete in founds. 35/- $2292.50 200.00 Masonry in Footings. 40/- $800.00 90.00 Superstructure. 40/- $3600.00 21.00 Coping and Bed stones. $700.00 4200.00 Dry Stone behind abuts. c.ft. 2/- $84.00 3 20' Spans landed in Kowloon. each 500/- $1600.00 3 Carriage, erection & painting. 100/- $300.00 Total $10151.50 Contingencies 10% $1015.15 Grand Total $11166.65 Page 78 was not directly related to the main content, hence not included. The initial part of the text appears to be OCR errors or unrelated content, so it was not included in the output. The main content starts with "C.R.E. No. 86," and is formatted into a table for better readability. The table includes columns for Quantity, Description, Unit, Rate, and Amount, as per the original content. The "Page 78" information is preserved at the end, as per the instructions.
Baseline (Original)
78 .CBWlIBM notneD noolwod 00 0.0 ? 200 02 82 ZOITO3e HRITISIFI STAMIT23 C.R.E. No, ai, Tkowloon Canton Canton Railway. 86 BRITISH SECTION ESTIMATE. wwwwww may be a ,8ZİT¤ best nisl Tota bash do? Main Head Bridges, Sub. Head Major No4/. M.0 e A seis Q** * Mo Work Three 20' 0. at Chain 92:580 Quantity. DESCRIPTION. or I .07. Bl. - Drawing No.C.R.F.127**** AMOUNT. Rate. Unit. $ Cts. 91 Hi Aysoz Excavation in founds. 10/- To . : Itum Timber and pumping. 290 00. 500 00. tris $4550 Comorete in founds. 35/- 2292 50. 2000 Masonry in Foutings. 40/- 200 Superstructuro, 40/- 1160 3600 100. :00. OT TI 211 " Coping and Bed stones. * " 700 Dry Stone behind abuts. 2/- c.ft. 10/ 4.2 00. 7 00. : อส 3 20' Spans landed in Kowloon. 500/- ach 1600 100. 3 Carriage, erection à painting. 100/- 300 00. 10151 50. Total IstoT 1015 15. Mesioniynino) Contingincies 10% 1116s 65. Grand Total letoT baeT0
2026-06-04 21:19:49 · Baseline
View content

78

.CBWlIBM notneD noolwod

00

0.0

? 200

02 82

ZOITO3e HRITISIFI

STAMIT23

C.R.E. No, ai,

Tkowloon Canton

Canton Railway.

86

BRITISH SECTION

ESTIMATE.

wwwwww may be a

,8ZİT¤ best nisl

Tota bash do?

Main Head Bridges,

Sub. Head Major No4/.

M.0

e A seis

Q**

* Mo

Work Three 20' 0. at Chain 92:580

Quantity.

DESCRIPTION.

→ or

I

.07.

Bl.

- Drawing No.C.R.F.127****

AMOUNT.

Rate. Unit.

$

Cts.

91 Hi Aysoz

Excavation in founds.

10/-

To

.

:

Itum

Timber and pumping.

290 00.

500 00.

tris

$4550

Comorete in founds.

35/-

2292

50.

2000

Masonry in Foutings.

40/-

200

Superstructuro,

40/-

1160

3600

100.

:00.

OT

TI

211

" Coping and Bed stones.

*

"

700

Dry Stone behind abuts.

2/- c.ft.

10/

4.2 00.

7 00.

:

อส

3

20' Spans landed in Kowloon.

500/- ach

1600

100.

3

Carriage, erection à painting.

100/-

300

00.

10151

50.

Total

IstoT

1015

15.

Mesioniynino)

Contingincies 10%

1116s

65.

Grand Total