C.R.E. No. 86,
Kowloon Canton Railway.
BRITISH SECTION ESTIMATE.
Main Head Bridges,
Sub. Head Major No. 4.
Quantity. DESCRIPTION. Unit. Rate. AMOUNT. Drawing No.C.R.F.127 290.00 Excavation in founds. 10/- $290.00 500.00 Timber and pumping. $500.00 2292.50 Concrete in founds. 35/- $2292.50 200.00 Masonry in Footings. 40/- $800.00 90.00 Superstructure. 40/- $3600.00 21.00 Coping and Bed stones. $700.00 4200.00 Dry Stone behind abuts. c.ft. 2/- $84.00 3 20' Spans landed in Kowloon. each 500/- $1600.00 3 Carriage, erection & painting. 100/- $300.00 Total $10151.50 Contingencies 10% $1015.15 Grand Total $11166.65Page 78
was not directly related to the main content, hence not included. The initial part of the text appears to be OCR errors or unrelated content, so it was not included in the output. The main content starts with "C.R.E. No. 86," and is formatted into a table for better readability. The table includes columns for Quantity, Description, Unit, Rate, and Amount, as per the original content. The "Page 78" information is preserved at the end, as per the instructions.78
.CBWlIBM notneD noolwod
00
0.0
? 200
02 82
ZOITO3e HRITISIFI
STAMIT23
C.R.E. No, ai,
Tkowloon Canton
Canton Railway.
86
BRITISH SECTION
ESTIMATE.
wwwwww may be a
,8ZİT¤ best nisl
Tota bash do?
Main Head Bridges,
Sub. Head Major No4/.
M.0
e A seis
Q**
* Mo
Work Three 20' 0. at Chain 92:580
Quantity.
DESCRIPTION.
→ or
I
.07.
Bl.
- Drawing No.C.R.F.127****
AMOUNT.
Rate. Unit.
$
Cts.
91 Hi Aysoz
Excavation in founds.
10/-
To
.
:
Itum
Timber and pumping.
290 00.
500 00.
tris
$4550
Comorete in founds.
35/-
2292
50.
点
2000
Masonry in Foutings.
40/-
200
幛
Superstructuro,
40/-
1160
3600
100.
:00.
OT
TI
211
" Coping and Bed stones.
*
"
700
Dry Stone behind abuts.
2/- c.ft.
10/
4.2 00.
7 00.
:
อส
3
20' Spans landed in Kowloon.
500/- ach
1600
100.
3
Carriage, erection à painting.
100/-
300
00.
10151
50.
Total
IstoT
1015
15.
Mesioniynino)
Contingincies 10%
1116s
65.
Grand Total
letoT baeT0